Ramadan and Eid
campaign images

Seasonal campaigns for the UAE calendar, made from photos of your product, with room for Arabic and English copy and delivered before the date, not after.

Arabic coffee poured from a brass dallah in a hotel lounge
Ramadan 2027 begins around
Feb
UAE National Day
2 Dec
Days for test frames
2
Seasonal Campaign pack
AED7,500

The UAE
campaign calendar

Islamic dates move about 11 days earlier each year and depend on the moon sighting, so treat them as estimates.

MomentExpected dateBrief us by
White FridayLate November 2026Early November
UAE National Day2 December 2026Mid November
Dubai Shopping FestivalDecember 2026 to January 2027Late November
RamadanAround early February 2027Early January
Eid al FitrAround early March 2027Early February
Eid al AdhaAround mid May 2027Mid April

Seasonal
looks

Warm light, brass, oud and evening gatherings.

Arabic coffee poured from a brass dallahPerfume bottle on oxblood silk with oud wood and a dried roseWoman in an abaya at a floor to ceiling window above the cityModel in a black abaya walking through an old town courtyardEmirati founder walking a landscaped district walkwayGuest relaxing in a hotel suite above the city

Ramadan
campaign ideas

Ideas that work for UAE brands, without the clichés.

  • Iftar and suhoor tables. Your product as part of the evening, not in front of it.
  • Gifting. Boxes, hampers and wrapped sets for Eid, with room for a price.
  • Night and lanterns. Warm, low light and the quiet of late evening.
  • Giving back. Community and family moments, handled with restraint.
  • Before and after sunset. Two looks for the two halves of the day.

National Day
and White Friday

Celebration without breaking the rules.

For UAE National Day we use the colours, the landscapes and the spirit of the day, but we do not generate the flag, the national emblem or leaders, in line with UAE media guidance. For White Friday and the Dubai Shopping Festival, the focus is on offers: bold key visuals with clean space for prices and codes.

Packs

Fixed prices, the same on every page. A Drop covers one product in one look. A Campaign covers up to three products or three scenes.

Drop

20 images

AED 3,500

One product, one look. For a launch post, a new flavour or a seasonal refresh.

  • 20 finished images, 60 files
  • 1 product, 1 art direction
  • 1:1, 4:5 and 9:16 crops
  • 2 revision rounds
  • Commercial licence, paid ads included
Start with Drop

Delivery in 5 working days

Campaign

50 images

AED 7,500

A full campaign across feed, stories, site and outdoor. The pack most brands need.

  • 50 finished images, 200 files
  • Up to 3 products, 3 scenes
  • All four ratios plus a print key visual
  • Moodboard and test frames first
  • 2 revision rounds
Start a campaign

Delivery in 7 working days

Always-on

60 images a month

AED 6,000/month

Your look, locked and refreshed every month. For brands and agencies that post daily.

  • 60 new images every month
  • Your look kept consistent month to month
  • New products added any time
  • 72-hour turnaround on new drops
  • Cancel with 30 days notice
Talk about Always-on

Ongoing, billed monthly

Questions

When should we brief a Ramadan campaign?

By early January for Ramadan 2027. Test frames take 48 hours and a Campaign pack 7 working days, so there is time for approvals and media booking.

What are good Ramadan campaign ideas for brands in the UAE?

Iftar and suhoor tables, gifting, family gatherings and warm night scenes work well. The best ideas put your product inside the moment instead of in front of it.

Can you add Arabic copy to the images?

We leave space for Arabic and English copy in every key visual. Typesetting usually stays with your designer.

Can you use the UAE flag in National Day images?

No. We do not generate national symbols or leaders. We use colours, landscapes and celebration instead.

Can we reuse the images next year?

Yes. The licence is perpetual, so the set can run again in 2028 with new copy.

Book your season now

Tell us the product and the moment. We reply within one working day with dates for test frames and delivery.

Keep reading